Reserved Listing - Exchange Order Price Difference - Cosrea Cosplay
Reserved Listing - Exchange Order Price Difference - Cosrea Cosplay

Reserved Listing - Exchange Order Price Difference

$ 15.00


  • DETAILS
  • PRODUCTION TIME
  • SIZING
  • CUSTOMIZATION
  • SHIPPING

Detail
Reserved Listing - Exchange Order Price Difference - $15

Important Notes
1) Click on Size tab for available preset store sizes.
2) Click on Custom tab for available custom options such as lace ties and corset boning as well as instructions.
3) Click on Time tab for current require production time.
4) Click on Shipping tab for shipping rates and also estimated delivery time frame.


Free Quote
Need a quote for a custom costume set?
Cosrea is now accepting custom commission orders. Fill out the Quote Request Form and we would love to talk about your custom project!

Have a question?

 

Size

Preset Store Size
1) Size may run small. Additional 0.5inches for all circumference area is recommended.
2) Measurements are in inch.

Womens
XS  - Height 5'0 - Bust 33 - Waist 25 - Hip 35
S   - Height 5'3 - Bust 35 - Waist 27 - Hip 37
M   - Height 5'4 - Bust 37 - Waist 29 - Hip 39
L   - Height 5'6 - Bust 40 - Waist 33 - Hip 43
XL  - Height 5'7 - Bust 44 - Waist 36 - Hip 46
2XL - Height 5'9 - Bust 45 - Waist 38 - Hip 48
3XL - Height 6'0 - Bust 47 - Waist 44 - Hip 52

Mens
XS  - Height 5'4 - Bust 35 - Waist 29 - Hip 37
S   - Height 5'6 - Bust 38 - Waist 31 - Hip 39
M   - Height 5'7 - Bust 40 - Waist 34 - Hip 42
L   - Height 5'9 - Bust 46 - Waist 37 - Hip 47
XL  - Height 6'0 - Bust 47 - Waist 39 - Hip 49
2XL - Height 6'2 - Bust 49 - Waist 43 - Hip 50
3XL - Height 6'4 - Bust 51 - Waist 46 - Hip 54

Children
S  - Height 3'6-4'2 - Bust 25 - Waist 22 - Hip 28
L  - Height 4'2-4'9 - Bust 29 - Waist 24 - Hip 36

Custom

Available Custom Options
1) Custom Sizing - Free
2) Lace Back - Free. Available in 3 styles, see pictures here.
3) Corset Boning - $25. Separate boning layer under bodice

Custom sizing order is free of charge and available upon request.
Please include the following measurements and any additional measurements that is important to you.


Height
Weight
Shoulder Width
Chest
Waist
Hip
Arm Length
Bicep Circumference - Only for costumes with sleeves
Inseam Length - Only for costumes with pants
Dress / Skirt Length - Measure from shoulder down to desire length

Time

Production Time Require - 10-15 Days
Special Requests - Additional 3-7 Days
- Corset boning and fabric change requests

Extended Production Time 15-35 Days
- Only for specific complex costume sets.
- Please contact us for a estimated time frame and potential Rush Order before ordering if you may have a deadline date.

Rush Order - Available base on schedule availability, free of charge.

 

Shipping

1) Please remember, these are average transit time. Exact time frame may be different depending on destination city and location.
2) All shipping methods includes full tracking.
3) If you have specific preferences for packaging, please contact us as soon as possible.

Standard Shipping 7-15 Days FREE
- Via DHL, EMS, DPLEX, Standard Postal
Express Shipping 5-10 Days $18.99
- Via DHL, EMS Express
Priority Express Shipping 3-8 Days $24.99
- Via DHL Express

COSREA COSPLAY PRODUCTION TIME FRAME

Important Notes

1 - Below are our current average production time frame per collection.
Customization and personalization requests may add to the time frame noted.

2 - Rush order request is free and per schedule availiability.
Please contact us for confirmation if you have a rush deadline date.

3 - Armors, Props and Custom Orders will require a longer production time.
Please contact us for our current custom production time before placing your order.

Disney Inspired
Collection

7-15 DaysCustomization Requests adds additional 3-10 daysRush order and deadline date request available
Cosplay Costumes7-18 DaysCustomization Requests adds additional 3-10 daysRush order and deadline date request available
Costumes with accessories/props15-25 DaysCustomization Requests adds additional 5-15 daysRush order and deadline date request available
Wigs3-5 DaysCustomization Requests adds additional 5-15 daysRush order and deadline date request available
In Store Props7-20 DaysCustomization Requests adds additional 5-15 daysRush order and deadline date request available
Custom Commissions7-35 DaysCustomization Requests adds additional 5-15 daysRush order and deadline date request available
Custom Armors 
Custom Props
55-95 Days Quoted base on order details 

Important Notes

1 - Our sizes do run small; please do take a minute to double check the measurements before selecting a size.


2 - Custom sizing is free and available upon request, please include the following:
- Gender
- Height
- Weight
- Shoulder Width
- Bust Circumference
- Natural Waist & Drop Waist Circumference
- Hip Circumference
- Top / Dress / Jacket Length - optional, from collarbone down to desire length
- Skirt / Pant Length - optional, full length

3 - For costumes with matching shoes or boot covers, please include the following:
- Gender
- Shoe Size
- Foot Length / Width
- Ankle / Calf Circumference


4 - If you have a specific fitting preference, please also include that with your measurements.


Please don't hesitate to contact us for help on any sizing and measurement questions!

COSREA CUSTOMIZATION OPTIONS

Important Notes

1 - Customization options, including custom sizing are available upon request.
Complex requests such as fabric change or additional detail may require additional charge.

2 - Customization may require additional production time; averaging 3-5 days in additional to our regular production time frame.

3 - Custom sizing request is free and highly recommended for a personalize fitting.
Require measurements are noted below.

Please don't hesitate to contact us for any customization inquiry or measurement questions!

COSREA CUSTOMIZATION REQUESTS
For additional requests such as detail change or embroidery request, please contact us
for a custom quote on price and time frame.
Custom Sizing

Free and available upon requestAvailable for all in store costumes, exclude fast ship items.
Back Closure (Lace Tie)Free and available upon requestAvailable for Disney Inspired Collection and selected custom costumes.
Fabric Change$15-$45**Available for selected costumes with custom quoting.
Add/Remove SleevesQuote on projectAvailable for selected costumes with custom quoting.
   

COSREA CUSTOM SIZING MEASUREMENTS

- Please include all measurements that are applicable to your costume set
- Include any fitting requests and preferences
- Dress and jacket length are measure from the tip of your shoulder down to desire length

GenderHeightWeight 
Shoulder WidthChest CircumferenceNatural Waist 
Circumference
Low Waist
Circumference
Hip
Circumference
   
ADDITIONAL MEASUREMENTS  
Arm LengthLeg Length

Bicep 
Circumference

Thigh
Circumference
Upper Body
Length
Lower Body
Length
  
Jacket / Top
Length
Pant / Skirt
Length
Dress Length 
    
Shoe SizeFoot LengthFoot Width 
Ankle
Circumference
Calf
Circumference
Knee
Circumference
Heel
Height
COSREA SHIPPING OPTIONS

Important Notes

1 - Transit time noted below are base on average time frame; please take note of local holiday and weather conditions that may add to the transit time.

2 - Tracking is available for all shipping options.

3 - Alternative carriers are available upon request.

Free Standard ShippingWorldwide10-15 DaysTracking IncludedDHL, EMS, DPLEX, Fedex
Free Expedite Shipping
(For orders over $50)
Worldwide5-12 DaysTracking IncludedDHL, TNT, Fedex
Expedite Shipping
(For orders under $50)
Worldwide5-12 DaysTracking IncludedDHL, EMS Express, Fedex
Priority Express ShippingWorldwide3-9 DaysTracking IncludedDHL Express, TNT
EMS Express
Custom Armor & Prop
(Large dimension package)
Worldwide10-25 DaysTracking IncludedEMS Express, Fedex Ground

Size Chart & Measurement Guideline

SIZE & MEASUREMENTS INFORMATION

   Sizing Guideline

Our sizes do run small in comparison to standard US, Canada, UK sizing.
Please make sure to cross check the measurements listed for each size when choosing a preset size. 

Some costumes may also have distinct sizing standards.
Individual size guides can be found on the individual product pages.

   Finding The Right Size

To find the right size, please compare your height and body circumference measurements (chest / waist / hip) and choose
the size that is slightly larger than your base measurements.
The recommended wiggle room would be 0.5 - 1 inch (1.3 - 2.5 CM) for a standard fit.

   Custom Sizing Request

Custom sizing is free and available by request for most costumes in store.

To request, please select Custom Sizing under Size Options then include your measurements as well as any fitting requests in the Measurement Box
with your order. 
We encourage you to also include in specific measurements such as length request and sleeve opening if you do have a specific personal preference.

   Required Measurements

Download our complete measurement form here: (mandatory and required for full custom order and armor sets)
PDF Version

Word Version


For standard in store costumes
Gender

Height

Weight

Shoulder Width

Chest Circumference

Natural Waist Circumference (your narrowest upper waist)
Drop Waist Circumference (your low waist)
Hip Circmference

Arm Length
Bicep Circumference
Inseam (for pants)
Dress Length (optional, measure from shoulder down to desire length)

   Measurement Guideline

Please refer to our Measurement Guideline Image below for reference on measurements. (video tutorials coming soon!)

Height & Weight - your total body height and current weight
Shoulder Width- measure from the back, shoulder tip to tip
Bust & Hip Circumference - measure at the widest part of your chest and hip
Natural Waist Circumference - your narrowest upper waist
Low Waist Circumference - your lower drop waist, by belly button

Dress Length - measure from shoulder down to desire length
Bodice Length - measure from shoulder or collarbone don to desire length
Skirt / Pant Length - full length measurement

If you have any questions or need additional guidance, please don't hesitate to contact us!

   Fitting Requests

We encourage you to include in any fitting requests and preferences with your order.
Such as:
- wider sleeves and wider fit for upper arm
- form fitting fit around waist and chest
- additional wiggle room for chest area

We want to make sure the costume set fits both comfortably and accurately for you.

SIZE CHART

MEASUREMENT GUIDELINE